Macclesfield District General Hospital

Macclesfield, Cheshire

The Hospital complex has been fully refitted by OBS with a NATIVE BACnet Building Energy Management System. The refit was carried over a very tight programme of six weeks!

Due to the hospitals 24 hour operation the upgrading of the existing control system had to be carefully planned in conjunction with the Estates Department.

The New BACnet System provides access to the various plant rooms throughout the Macclesfield and Congleton Buildings via the Hospitals own IT Network.

The buildings are interactive and as such Energy Usage, Building Temperature and Control Information are all displayed on our NATIVE BACnet Graphics Head End. The BMS System is server based and therefore is accessible from any PC within the Hospital making access to the system easier and simple for the Estates Department.